
Pratap B
- Jobs booked
- 1
- Reviews
- 1
Reviews (1)
Zeb building
9.33 Kitchen and dining floor
Posted 18 July
4 man crew turned up got the job done then came back next day to complete the finishing touches as it was a long day start at 1030finished at 830Verified reviewerJob location: G69