Roof texture

Pratap B

Jobs booked
1
Reviews
1

Reviews (1)

  • Zeb buildingZeb building
    9.33

    Kitchen and dining floor

    Posted 18 July

    4 man crew turned up got the job done then came back next day to complete the finishing touches as it was a long day start at 1030finished at 830
    Verified reviewer
    Job location: G69