
Martyn R
- Jobs booked
- 2
- Reviews
- 2
Reviews (2)
Spacecraft projects Limited
10 Landscaping completed to cost, to time and to quality.
Posted 24 October 2025
An early response to my enquiry was shortly followed by a site visit. A quote, with suggested options, enabled work to commence less than two weeks later. Initial work was to clear a significant amount of scrub before an assessment could be made on how best to proceed with the landscaping on an uneven terrain. Ronan achieved this through a combination of steps and slopes, using sleepers, gravel and timber edging. At each stage Ronan kept us informed of progress and provided options that would enhance our property's outside space. Initial enquiry to work completion was less than seven weeks.Verified reviewerJob location: SA62Thyme Construction Ltd
10 Bathroom Repairs and Floor Replacement
Posted 28 January 2025
An early response to my initial enquiry to assess bathroom floor damage following a water leak from a shower cubicle. This was quickly followed by a site visit to produce an estimate. Once the estimate was accepted, work commenced on the agreed date and completed on time, to specification and to cost. There was mimimal interruption to the household as the work progressed and the bathroom was cleared of debris at the end of each working day. Will definitely use Simon and his team from Thyme Construction for any future maintenance work.Verified reviewerJob location: SA61