Roof texture

Jong K

Jobs booked
4
Reviews
1

Reviews (1)

  • Andrew handymanAndrew handyman
    5

    Make good of the area, build a wooden box and paint

    Posted 1 day ago

    The instruction was simple which included make good of the area. The work feels rushed done in 1h with 2 people. Filler, painting, caulking done all without waiting that it’s dry. The picture is the final deliverable, it’s blistering as one would expect. I have to call someone else to redo it properly.
    Job location: N1