Photos

  • Album cover: Water and smoke damage

    Water and smoke damage

  • Album cover: House renovation

    House renovation

  • Album cover: Bathroom to shower room

    Bathroom to shower room

  • Album cover: hubber bodmin

    hubber bodmin

Main bedroom on completion
new kitchen
new kitchen utilising under stair area
living room and kitchen area on completion
rotten floor boards removed, joists strengthened, inulation in and new boards
Ceilings removed
kitchen and stairs
cottage stripped and temporary electric supply/meter fitted
Air movers and dehumidifiers drying cottage
old cabling prior to complete strip out and rewire
new flooring throughout
new engineered oak floor on dpc membrane and underlay. Walls have been treated with anti salt treatment.
Shower room on completion
Main bedroom on completion