Download app

Photos

FINISHED
NICE OLD EDWARDIAN FLOOR BOARDS IN NEED OF
READY FOR EDGING AFTER BEING CLEANED WITH 36 GRIT SANDPAPER
Preview of qsh69JTbCMjT3zEm4MAV.
Preview of gBSOigFHuETyPQD8rNME.
Preview of Ol4UF7J8fucOGg9cyz48.
Preview of SANDING OF NEWLY INSTALLED OAK BLOCK FLOOR.
Preview of NICE AND NEAT BORDER WORK.
THE FLOOR IS FILLED USING THE FINE SAWDUST AND LECOL FILLER
BEADING GOING ON AFTER TWO COATS OF JUNKERS STRONG LACQUER AND READY FOR A RUB DOWN AND FINAL COAT.
WET AFTER THREE COATS OF JUNKERS STRON WATER BASED LACQUER.
ELECTRIC UNDERFLOOR HEATING READY FOR KARNDEAN TO BE INSTALLED
FLOOR PREPARED USING VERSILAY SYSTEM
Preview of FINISHED.
BACK TO NORMAILTY
ALL DONE
WALNUT BLOCK FLOOR RESTORED
BEFORE LACQUERING
Just before uplifting and renewing
Doping repairs to the sub floor
Plywood is down and so is the crown lines
Crown line from different angle
Cutting the borders in
Finished borders and also the plumbing work we arranged can be seen
Two coats of Junkers Strong waterbased Matt lacquer on and ready for a rub down before the final coat is applied
Just applied the last coat and waiting for it to dry
Preview of CRUCIAL TRADING.
Preview of KARNDEAN FLOORING.
Preview of OUR SHOP.