Photos

  • Album cover: Office build

    Office build

  • Album cover: Rsj for garage

    Rsj for garage

  • Album cover: Rydal drive

    Rydal drive

  • Album cover: Photos

    Photos

  • Album cover: To clear out bathroom, remove parts of wall on right, apply plaster board.

    To clear out bathroom, remove parts of wall on right, apply plaster board.

  • Album cover: Install new bathroom suite.

    Install new bathroom suite.

  • Album cover: Doors hanging, fitting plaster boards, above doors and fitting door handles.

    Doors hanging, fitting plaster boards, above doors and fitting door handles.

  • Album cover: Digging footings as required by building regs

    Digging footings as required by building regs

  • Album cover: Completed structure of extension and removed roof from garage.

    Completed structure of extension and removed roof from garage.

  • Album cover: Constructing roof on new extension.

    Constructing roof on new extension.

  • Album cover: Plumbing and drainage.

    Plumbing and drainage.

  • Album cover: Plaster board and insulation.

    Plaster board and insulation.

  • Album cover: Tiling wet room.

    Tiling wet room.

  • Album cover: New cloak room and hallway.

    New cloak room and hallway.

  • Album cover: Fitted stair rails and plaster board to hall ceiling.

    Fitted stair rails and plaster board to hall ceiling.

  • Album cover: Dug footings for extension.

    Dug footings for extension.

  • Album cover: Brickwork and drainage.

    Brickwork and drainage.

  • Album cover: Brickwork and drainage.

    Brickwork and drainage.

  • Album cover: Installation of R S J and block work.

    Installation of R S J and block work.

  • Album cover: Finished block work, erected roof.

    Finished block work, erected roof.

  • Album cover: Finished block work, erected roof.

    Finished block work, erected roof.

  • Album cover: Extension finished.

    Extension finished.

  • Album cover: Extension finished.

    Extension finished.

  • Album cover: Completed roof.

    Completed roof.

  • Album cover: Completing work to the roof

    Completing work to the roof

  • Album cover: Built block work and fitted floor joists.

    Built block work and fitted floor joists.

  • Album cover: Built block work and fitted floor joists.

    Built block work and fitted floor joists.

  • Album cover: Block work 1st floor to roof and roof joists.

    Block work 1st floor to roof and roof joists.

  • Album cover: Concreted foundations and slab fitting drainage and man hole.

    Concreted foundations and slab fitting drainage and man hole.

  • Album cover: Internal works.  Loft insulated floor boards fitted.  Plaster boarding to walls and ceiling completed on 1st floor

    Internal works. Loft insulated floor boards fitted. Plaster boarding to walls and ceiling completed on 1st floor

  • Album cover: Loft conversion

    Loft conversion

  • Album cover: Roof repair

    Roof repair

  • Album cover: Peter Noad extension

    Peter Noad extension

  • Album cover: Rydal drive

    Rydal drive

  • Album cover: Redroofs

    Redroofs

  • Album cover: Jenton ave

    Jenton ave

  • Album cover: Side extension

    Side extension

  • Album cover: Loft conversion

    Loft conversion

  • Album cover: New kitchen

    New kitchen

  • Album cover: Building new extension

    Building new extension

  • Album cover: Bathroom refurb

    Bathroom refurb

  • Album cover: Door fitting

    Door fitting

  • Album cover: New kitchen

    New kitchen

Preview of During.
Preview of During.
Preview of After.
Preview of After.