Photos

Now kitchen installation and stone flooring, part of a complete build.
Rebuild after tree roots caused the building to sway, structurally strengthened, pulled upright and rebuilt.
Totally demolished building except main walls, rebuilt and fitted out.
Demolished tired UPVC porch, extended and rebuilt in green oak with direct glazing method.
Inspected chimney, identified faults and repointed as necessary.