Photos

  • Album cover: Bathroom refurbishment

    Bathroom refurbishment

  • Album cover: New hot water after cylinder installation

    New hot water after cylinder installation

  • Album cover: New shower mixer

    New shower mixer

  • Album cover: New boiler

    New boiler

  • Album cover: New combi boiler

    New combi boiler

  • Album cover: New boiler fitting

    New boiler fitting

  • Album cover: Waste pipe

    Waste pipe

  • Album cover: full bathroom fitting 2020

    full bathroom fitting 2020

  • Album cover: 2019

    2019

  • Album cover: 2015

    2015

  • Album cover: 2012

    2012

  • Album cover: 2017

    2017

  • Album cover: 2016

    2016

  • Album cover: 2018

    2018

  • Album cover: 2013

    2013

  • Album cover: Bathroom fitting

    Bathroom fitting

  • Album cover: New boiler fitting and heating system upgrading

    New boiler fitting and heating system upgrading

  • Album cover: New toilet unit

    New toilet unit

Preview of 6miRfHbcfb2SZMSCjv6l.
Preview of 9Lfnjo3ecS0RJJjMLPUd.
Preview of m49tf7oBCgkbCm1bqgHN.
Preview of aVf0vuYKkjStUiTaqJgz.
Preview of ToC7uZu9cMa33pDhiYeG.
Preview of pb4nxWBRXgk9ULrQzbCI.
Preview of GpYzETPkxSPLQNmEHsvn.
Preview of 8mlqw2IP3D9C8B6VU2c2.
Preview of MqzrCeGUO3owY5h8Pk14.
Old bathroom
Old bathroom
Really a big mess and n solid pipe and connections , new waste pipe fitted with 2 separate bath and sink waste
As you could see on picture not enough support on back of plaster board . All plaster board around bath removed and fitted by new aqua board
New waste pipe with 2 connections for bath and basin
Waste pipe fitted for bath under floor boards . Also hit and cold supply installed for shower mixer
More support fitted on the wall for shower wall
Old bathroom before taking out