Photos

  • Album cover: Photos

    Photos

  • Album cover: Latest Work Album 2015

    Latest Work Album 2015

Preview of ATtpnG0mCySM6sO00KgK.
Full  refit
modification of pipework from air sep.
Preview of Air sep removed showing blocked with sludge..
Preview of Air sep removed showing blocked with sludge..
Preview of Fernox TF1 magnetic filter fitted.
Preview of TF1 filter completely blocked..
Preview of Kamco Inline magnetic filter during power cleanse.
Preview of Kamco Inline magnetic filter full with magnetite sludge..
Preview of Power flush kit setup with filter in use.
Preview of Black sludge being pumped from CH  system.
New Boiler Fitted  existing pipework modified after removal  plastering of old G rated floor standing balanced flue boiler footprint.
New Combi  fitted in existing airing cupboard, Vertical flue through roof.
Preview of Copper pipework to New CH system..
Finished job.
Lovely little British built wood burner, during installation , great heat output for size
We managed to fit the boiler into a small gap a happy customer
Preview of Fit new Kitchen  Plumbing , Gas, Electrics by our Team.
Updated, Relocated boiler -  from old Back Boiler Unit.
Preview of Fitted New Ideal logic 30kw combi in loft.
Preview of Panoramic Inset Gas Fire.
Preview of Team Tigergass company vehicle.
Preview of ideal logic 24kw combi fitted in flat to replace G rated boiler..
New system installed to comply with legionella regulations.
Preview of New Ensuite bathroom  toilet fitted.
Preview of New walk in Shower installed.