Very unpleasant experience with delays, inconvenience, appalling communication, and a poor, unfinished outcome. Different people turned up each day (if at all), showing a lack of contingency. The door in the stud wall wasn’t installed to the architect’s drawings; redoing it left visible marks. The transom window was installed poorly, had to be redone, and still looks low quality. The bath leaked heavily, tiles were left dirty and cracked, the door had gaps, and the wall and ceiling painting was poor.
Response from Alt Construction Ltd
Thank you for your review. It helps us improve. It also proves that we can not satisfy all our customers, even though some have different needs than others. And apologies for not replying at your messages at 10 PM about the hot bath you took! Different people turned up because I have a team of 5 and each time I would send someone he wouldn't want to come back. I wonder why?! Yes, there was a leak and we came back and sort it.