Photos

  • Album cover: Completed Work

    Completed Work

  • Album cover: Work In Progress

    Work In Progress

  • Album cover: On The Job !

    On The Job !

  • Album cover: Door entry

    Door entry

Installed pillar garden lights on a newly built 60meter wall
Installed a chandelier surrounded by LED strip lights and down-lights to achieve amazing light design
Preview of Rolec EV charger installed.
Preview of Kitchen Lighting.
Fike fire alarm installed with 4 zones and a smoke vent
Preview of Electric vehicle charging point.
100 A Isolator fuses installed to provide isolation for three consumer units on a new build
Preview of Living room Lighting.
CCTV, motion sensor lights and door entry installed at the entrance of three new flats.
Preview of Lights.
Preview of 6KW electric boiler..
Preview of Light with adjustable hight .
Preview of Drive way uplights.