Photos

A temporary shower was fitted until they could afford to redo the bathroom as money was tight.
After turning off the water the shower was removed safely
This shower was falling off the wall, so the customer used duct tape to fix it to the wall until a plumber turned up.
Preview of LvsCeaj9wiiZrzsuCnKf.
Preview of Before the cleaning process.
Preview of Job done cleaned, regrouted and resealed around the bath.
Remove the old suite, but leave the tiles
Preview of Fit bathroom suite.
Preview of Bathroom refurbishment.
Using natural stone tiles on walls and floor
Preview of The old tiles removed and new tray fitted.
Preview of New tray and replaced the old tiles with new ones.
Preview of Job finished.
Preview of Major water damage due to a cowboy bathroom fitter..
Preview of We had to remove all the blown plaster.
Preview of Replastered New bathroom suite Retiled Job done.
Got called out for a second opinion on someone’s shower room
Gap behind basin!!
No floor tiling under units
No waste for washing machine as asked by customer
Waste fixed but found not to be fitted correctly
WC push button not fitted correctly!
WC pan cut into unit, instead of in front of the unit!
Everything removed for a complete reset!
All plumbing redone with soldered fittings.
Washing machine waste and plumbing done.
New waste repositioned and tray fitted!
False wall refitted correctly!
Units refitted correctly!
Washing machine in and working!
Aquaboards and shower fitted!
Tiles and units finished!
Shower Screen fitted and shower complete and all tested!