Photos

  • Album cover: new consumer unit

    new consumer unit

  • Album cover: ev charger

    ev charger

  • Album cover: ev charger install

    ev charger install

  • Album cover: new sub-mains wired for 5 flat converted house in Clapham

    new sub-mains wired for 5 flat converted house in Clapham

  • Album cover: flat rewire in Kensington

    flat rewire in Kensington

  • Album cover: new dual RCD consumer unit installation in ex-local authority flat

    new dual RCD consumer unit installation in ex-local authority flat

  • Album cover: consumer unit replacement with new dual RCD metal clad unit

    consumer unit replacement with new dual RCD metal clad unit

  • Album cover: electric vehicle charging point and new consumer unit installation

    electric vehicle charging point and new consumer unit installation

  • Album cover: new consumer unit

    new consumer unit

  • Album cover: off peak consumer unit overheated main switch found during the inspection

    off peak consumer unit overheated main switch found during the inspection

  • Album cover: time to replace the oldest consumer unit i’ve seen

    time to replace the oldest consumer unit i’ve seen

Preview of cN8oWVfQrAn5mJUSKScJ.
Preview of 9nsppGW38Gn7rxZXNDuC.
Preview of rKPIyWPENlChjTJy4PIs.
Preview of 105WUI7qwxDhKSSPHuvo.
Preview of k03xFvrRZCkMc1QY21HA.
Preview of 5I8VOPEGkouJozLA9ilC.
Preview of fm5sJY4NpEbDyjNJHs2C.
Preview of EZl4WSX1FXuWckvsEClN.