Photos

  • Album cover: Vaillant ecofit pure in loft, back boiler removed

    Vaillant ecofit pure in loft, back boiler removed

  • Album cover: Boilers

    Boilers

  • Album cover: Plumbing Work

    Plumbing Work

  • Album cover: Cloakroom Refurbushment

    Cloakroom Refurbushment

Preview of New Vaillant ecofit plus 825 .
Cupboard after removal of cylinder. Now double the space
Cylinder cupboard on old system ready to be removed
Back boiler removal in preparation to reroute pipes to new boiler site
Cylinder removal to utilise as extra cuoboard space
Back boiler disconnected and new boiler resited into loft
Pipe work leading from old system to connect to new boiler
Back boiler disconnected and new boiler resited into loft
Back boiler disconnected and new boiler resited into loft