Reviews

  • 4

    Made it up as they went along, got it wrong - replaced.

    Posted 11 May

    Struggled to do simple things correctly on a standard build as a subcotnractor to Celestial Windows. 3 points of correction identified by Building Control when I called them - concerned about the poor quality of blockwork. They found the missing insulation and the window reveals too big for the supporting pillars hence extra calculations needed. The lintels into my house were at 1850mm from the floor - so about 6ft.... Also couldn't mix the outer mortar to a consistent colour. Never say a plan or diagram from him or the window company. Eventually had to have him+team replaced.
    Job location: TS10