Reviews

  • 1.25

    Loft conversion into 2 bedrooms and a shower room

    Posted 13 February 2024

    The build is ongoing. We are now 9 months into a 6-8 week build. The work is still not finished, CPT construction caused a lot of damage to our home by not sealing roof properly meaning there is a lot of internal decorating to do. Our carpets, bedding, matress, 2 games consoles and countless other belongings have been ruined. There is also a large dent in my car bonnet from where he dropped a tile. Pieces of wood with nails in were left in garden and shared green and my son stepped on this causing plank wood to be attached to his foot. They now are now not turning up and ignoring us
    Verified reviewer
    Job location: HD7
  • 9.5

    Pointing and paving

    Posted 15 June 2022

    Curtis came when he said he would, did as was planned, came daily until the job was complete with a short break until the scaffolding came down. He spent ages going back and checking he was happy with the job and making sure we were happy too. Job now complete we are happy and have kept his number for future jobs. Highly recommend Curtis.. coffee milk no sugar!
    Verified reviewer
    Job location: HD8