Photos

  • Album cover: Groundwork’s

    Groundwork’s

  • Album cover: Customer side utility works

    Customer side utility works

  • Album cover: Installation of grp cabinets

    Installation of grp cabinets

  • Album cover: Paving and patio works.

    Paving and patio works.

  • Album cover: Ev charging points

    Ev charging points

Concrete finished footpath.
Concrete finished footpath
Sub base, sleepers and membrane installed
Customer asked for footpath to be extended with sleeper boarders
Finished concrete floor ready for screening and glass frame to cover 80ft well
Preview of Reinforced insulated concrete floor.
Ground preparation for concrete pour for new floor
Concrete complete ready for phase 2 of works.
Compacted sub base and sleeper edgings
Excavation of ground for sub base
Excavated trench for install of french drain system
Installed french drain System , due to damp  In building.
Aco drain System  installed
Sandstone patio
Preview of Patio.
Preview of Patio.
Sub base for new patio
Prep work for new patio
Excavation for new patio install
Preview of YfSJ2z51ZOfgI3Gba2kX.
Dig out for new patio
Installed new patio and pathway for client