Response from Drain Flo Solutions
Was asked to install a new 50mm waste pipe from the manhole to the room upon which a new kitchen was to be installed, which was completed as per building surveyors instruction, and was appropriately signed off by the building inspector as the work was carried out to spec
The concrete floor was concreted to the level discussed with the client, as there was existing floor tiles which were also being replaced so the concrete finish level was set slightly lower than the existing tiles to allow for the floor to be latexed and retiled
The customer was was left happy upon completion and work was signed off by the building inspector
Customer has neither contacted me via phone or email