Homeowner
Trades
Posted 21 November 2019
Posted 15 November 2019
Response from DSL Carpentry
The first day I arrived and saw the floor the concrete was so unlevel I could not lay the floor it needed to be levelled. On my return it was only half done witch was not correct but was asked to carry on with the work. The customer was told it would not be perfect but wanted to continue anyway. The work was booked in at the weekends and was agreed with this as I had a busy work schedule. The door thresholds were cut in for the customer he agreed to stick them himself as they need to be bonded to the floor as he brought them without any track to connect too. The customer had issue with my lad from day one he was very rude to him even though he was very polite to him. I was paid in full no questions asked and said any problems don’t hesitate to call. every day the house was hoovered and left clean and tidy as in every job I do. If there is anything the customer is unhappy with I’m more than happy to accommodate I’m just a phone call away.
Posted 06 November 2019
Posted 17 October 2019
Posted 10 October 2019
Posted 23 September 2019