Photos

Part of a full Rewire This consumer unit replaced an extremely old board, we also built a new cupboard to house it all in too!
Here a school was having issues with overloading on one of the Distribution Boards, so we seperated the kitchen and canteen to its own Panel and installed a new sub main from the origin to solve the issues.
Here a school was having issues with overloading on one of the Distribution Boards, so we seperated the kitchen and canteen to its own Panel and installed a new sub main from the origin to solve the issues.
Here a school was having issues with overloading on one of the Distribution Boards, so we seperated the kitchen and canteen to its own Panel and installed a new sub main from the origin to solve the issues.
Removed and replaced an Old Consumer Unit for a rental property in Great Offley
The water heaters in the nursery were constantly being left on from their respective local switches. We installed a contactor panel controlled via a timeclock to solve this problem ensuring they only come on between set times, vastly improving the energy use of this propert!
Here we replaced an old Unit with a new one and installed new Earth Bonding connections to gas and water
Common setup in the chells area where the old consumer unit is placed within a metal box on the wall. We installed a smartnew MK Consumer Unit at high Level and made a wooden door to cover the remaining electric meter from the old position
Here we installed a new mini Consumer Unit and spurs to provide individual isolation to multiple underfloor heating mats throughout a property having a vast extension
(Cover on previous Post)
Removed all clutter and combined storage heaters and power and lighting circuits to one split load RCD Consumer Unit
Old Eco 7 set up very cluttered and unneccesarytaking up a lot of space