Reviews

  • 3.5

    Concrete base for outbuildings

    Posted 23 October 2024

    the first day, they left after a few hours of digging, and turned up the following day with different guys. One of the guys mention they didnt know the person and saw a job posted on Facebook for a labour. They didnt even measure the base area (5m x 3m) so I had to go out with string and mark/ measure the area, at this point I didnt know what to do. They dug the area, and the owner kept popping in every few hours to check. When the concrete got delivered, it wasn't enough, so had to pay more. The concrete base isn't even level, and we now have to rectify this as its unsuitable standard.
    Verified reviewer
    Job location: DH4