Don't know where to begin to be honest
Lovely lad but tiling job is a shambles
Three plumbers later and fittings still not level
Tiles and finishing are terrible not level or even following on like they should be
Had no toilet water or bath so checked into hotel twice
The whole apartment was covered in tile dust because tiles was cut in bathroom with no dust sheets putting up
Still cleaning now
You couldn't even get in the bathroom because all tools in the bath
Bath has been marked enamel chipped
Shower was broken
Bathroom left in a state no cleaning or polishing of tiles
Left to us to do
Response from G-Way Floor and Wall Tiling
After accepting the job I knew the task at hand with it being a 3rd floor apartment and unable to cut outside to respect customers discretion. I have never cut indoors unless on-site but due to not having any other option cracked on. I taped up door and tried my best to ventilate through small window but dust did find its way through after access was needed and to clean tools.
I quoted a plumber into this job but never will again as I agree it was a nightmare after the first plumber damaged shower and bath, which in turn held the job up and spoiled momentum. I did polish the tiles but work had been carried out by plumber and joiner after. Never got paid for materials ie. silicone, beading that were needed, and never got paid for bath panel fitting or timbers provided. Had numerous jobs after where clients were happy with finished product