Quality of the work acceptable but with many snags that I had to resolve myself. Timekeeping quite poor: the deadline was missed (even if I was reassured 2 days before that there was no problem in meeting it) and things were rushed to be completed. Very untidy on site, I had to remove tools at the end of the job to put them in the garage. The kitchen was left in terrible conditions at the end of the job and I had to remove paint marks everywhere (from cupboards, windows, window sills, radiators etc). Most of the filler around the sockets was painted on without being finished or sanded.
Response from Handy Warhol Ltd
Luca requested a full refurbishment of his property all to be completed by the date he was moving in. ALL of our work was complete and he had employed other contractors to do the electrics, plumbing and floor installation which were all done during and after we had completed. Luca also decided to haggle on the price halfway through the project and we did our best to meet his limited budget. We cleaned after each day as we normally would and all mess was not left by us, we didn't even use the kitchen! No snagging was picked up and it was said on many occasions that we would happily return if there were any issues. All trades were on site at 7.30 and worked through to 4pm, although Luca was rarely on site. We painted throughout but unfortunately the 2nd fix electrics were done after we had finished so the making good around sockets was not done by us. Shocking claims that are all untrue and aimed at getting money off the invoice.