Photos

  • Album cover: some of my work

    some of my work

  • Album cover: Outside Work Sept 2018

    Outside Work Sept 2018

  • Album cover: Conservatory work - good as new

    Conservatory work - good as new

Removed all gutters and brackets and cleaned inside and out and replaced.  All external woodwork washed down, prepared and two coats of Sadolin exterior stain applied.  All masonary wall panels prepared and two coats of Dulux masonar paint applied.
Removed all gutters and brackets, cleaned inside and out and replaced.  All external woodwork washed down, prepared and two coats of Sadolin exterior stain applied.  All masonary wall panels prepared and two coats of Dulux masonary paint applied.
Outside to be prepared and painted
Outside to be prepared and painted
Preview of TOGMfO0hjY7JP78A5XqB.
Strip wallpaper, reline walls, hang new wallpaper, prepare woodwork and ceiling and paint
Preview of XXnPTM8Rw5ySg1qHh89O.
New walls, ceiling, paper and painted
Preview of Wr5JiAOt4SS6u6UgIlcJ.