It turned sour after we descoped tasks following heavy billing, invoicing almost double original estimates. From this point we only saw the builder three times in six months. A window was incorrectly sized (the sink is higher than the sill) and a fridge water supply was taken from the tank. Extension was left without drainage for six months along with unfinished brick work. Debris was left on our lawn for several weeks and water heating was disabled for a month. Three times we incurred extra cost hiring other firms to rectify work. HW&C declined to cover 50% of the bill for faulty UFH install.
Response from H W & C Construction Ltd
There were difficulties with this contract, but as far as I was aware the customer was more than happy with the completed project.
With regard to the plumbing and underfloor heating this was down to issues with complex pipework within the property which was resolved.
The customer was still residing in the property during the build and the services were fully functioning
There was nothing wrong with the UFH installation and therefore we were not prepared to pay for an external company to come in.
The customer took out items from the original contract half way through the build so the payment plan wasn't a true reflection at that point in time, but on completion it balanced out.
We do everything possible to give our customers what they wish for in their completed project, sometimes things don't always go according to plan, but we do our utmost to deliver a high quality level of workmanship and finish, as is displayed in many of our previous customer reviews.