Photos

  • Album cover: Ifm limited

    Ifm limited

  • Album cover: Ifm limited

    Ifm limited

Complete tested and fully operational lagging to be carried out
New heater in position piped and tested
Removal of defective water heater
Preview of jhP9CYzYYzf56iQqPpfA.
Preview of ncPqJUPnEUHPJpoAvnbG.
Preview of Water main repair 4 inch .
Preview of Water main repair 4 inch .
Preview of Commercial boiler section replacement .
Preview of Small cloak room install .
Preview of Unvented water heater fitted .
Preview of Small cloak room install .
Preview of In progress .
Preview of Spot light upgrade to LED.
Preview of In progress .
Preview of Ply floor before tiles .
Preview of Removed existing cloak room suite.
Preview of Removed existing cloak room suite.
Preview of Start of removal of existing cloak room suite.
Preview of Drain works London .
Preview of Drain works London .
Preview of Drain works London .
Preview of Drain works London .
Preview of Drain works London .
Preview of Commercial boiler service initial CP reading.
Preview of CWST replacement .
Preview of Fault finding water heater commercial .
Preview of Fault finding water heater commercial .