Reviews

  • 10

    Base and eretion of a shed

    Posted 02 October 2020

    It took less than a day but as the brick base needed to set the job was carried out over two days. I had already had a concrete base laid but it was slightly lower than the surrounding soil and I was concerned the shed would flood at worst or be very damp at best. The builder was very knowledgeable and we discussed the need to raise the shed off the concrete suggesting a brick base was used to lift the shed and a membrane secured to the underneath of the shed. The builder obtained the materials which I paid for,. I was very pleased with the end result.
    Verified reviewer
    Job location: BN3
  • 10

    New bathroom

    Posted 18 September 2020

    Brilliant and professional team - amazing attention to detail
    Verified reviewer
    Job location: BN1