Photos

Sawing PVC tubing
Determining whether cable is deenergised
Shower unit being wired up by one of our qualified electricians
One of our qualified electricians
New build extention where old cables have to be renewed
Supports acting as the supporting wall for us to wire
Routes of earth cabling
Installed low voltage light fitting in bathroom
Preperation for Shaverpoint
We have provided excellent electrical work for Slough shopping centre
We provide testing, all electrical installation work in commercial areas
Intake showing meter time clock for heating which effect Distribution board changes
Intake showing meter time clock for heating which effect Distribution board changes
These type of distribution boards need updating to 17th Edition distribution board
Picture shows that cables should be protected, i.e. trunking form
PVC distribution board
Fully covered and protected
MCB with RCD mainswitch splitload distribution board
Fully labelled, marked warning signs
Notice how the single live red wire is left loose unprotected
At a call out we discovered unsafe installation
Notice how the light has no protective barrel or hood cables nearly resting on fitting
Installed 3 phase isolater as a sub main distribution
we install 3 phase isolaters temporary or permanent
We carry out electrical installation work on all 3 phase supplies
Installed grid switching for commercial premises
We install any light fitting you provide or request us to provide
Cross earth bonding to water cistern pipes
Fully plumbed electric shower unit
Basin pipes cross earth bonded
Usually 110v 240v
Lighting installations should be connected together in a joint box
Newly installed electric slimline storage heater for any part of house,flat or office