  • 10

    Resin drive

    Posted 16 April

    The team of men arrived as promised and prepared the driveway over 3 days. Raising drains and making the old drive ready to receive the resin. Then when the weather allowed the team returned and laid the edging resin border. The following day the main drive was laid. The workmen were polite friendly and made sure we had safe access into our house at all times. They tidied up every night and once the job was completed they swilled the area swept and left everything clean. I am very pleased with the results.
    Verified reviewer
    Job location: NG21
  • 10

    New Drveway

    Posted 08 April

    Ryan and his team did an excellent job and he was very reliable
    Verified reviewer
    Job location: NG15