Photos

  • Album cover: NLA church

    NLA church

  • Album cover: Wood Green

    Wood Green

  • Album cover: Haringey property

    Haringey property

  • Album cover: Cleaned and restored property in Ruislip

    Cleaned and restored property in Ruislip

  • Album cover: Brick restoration and 100% re-point

    Brick restoration and 100% re-point

  • Album cover: Cleaning and restoration to a property in Ealing

    Cleaning and restoration to a property in Ealing

  • Album cover: Enfield property

    Enfield property

  • Album cover: Brick restoration

    Brick restoration

  • Album cover: Stucco repairs

    Stucco repairs

  • Album cover: Steps & paving

    Steps & paving

  • Album cover: Natural stone cantilever staircase

    Natural stone cantilever staircase

  • Album cover: Stone restoration & new build cladding

    Stone restoration & new build cladding

  • Album cover: Cleaning to listed building Wealdstone

    Cleaning to listed building Wealdstone

  • Album cover: Cleaned and restored property in Taplow

    Cleaned and restored property in Taplow

  • Album cover: Cleaning services

    Cleaning services

Preview of ygeUFDDRG9YhXdLRDe7s.
start of the cleaning and raking out of old pointing
raking out complete and cleaning finished to this area
Preview of Apex.
cleaned and repointed in our lime mortar mix to match yellow stock bricks
scaffold being struck, notice all existing stonework has been limewashed. The client and ourselves were very pleased with the finish
Before cleaning and repair
The stone pinnacles were in need of repair. Our team chiseled the old repairs back to a solid stone base before carrying out repairs
defective areas of the pinnacle have been repaired in a lime mortar bath stone premix as original. Notice triangular details have been built up in stages and reformed as originally was
repairs complete, ready for protective limewash
Preview of During.
Preview of After.
restored pinnacle taken from the ground
3 apex areas to the vestry were in need of major repair. Pullen restoration carried out  new bath stone coping replacements where necessary.
Cleaning and raking out started on the far right apex. Notice the whole half sections of stone hood mould has been cut back flat to the wall line, (directly above the red arch brickwork).This enables our masons to take an accurate template of the curve. Once this task is carried out we can then get the new stone in production.
Preview of During.
New hood moulds on closer inspection.
Preview of Hood moulds fixed and repointing to red rubbers (bricks) complete.
This photo shows all the cleaning, repointing, all 3 hood moulds taken out , templated , and re fixed in new bath stone.We also carried out mortar repairs to some of the buttress stones, and detailed stones around the hoppers at the top of the gutters.