Reviews

  • John C
    9

    kitchen fitting

    Posted 22 June

    very good clean and tidy on time and very polite 👍 would recommend. thanks
    Verified reviewer
    Job location: LS19
  • haydn c
    10

    Repairing a broken ceiling joist and plastering

    Posted 17 April

    Ben and his team were fantastic in their repair of our ceiling joist and plastering thereafter. He was punctual, communicative, provided a fair price and cleaned up and replaced everything after he completed the work. Would definitely recommend and will look to use him again for any future joinery work.
    Verified reviewer
    Job location: HX7
  • Anne-Marie O
    10

    kitchen installation

    Posted 27 January

    Ben and his colleagues did a great job installing our kitchen, and were easily able to solve all sorts of issues we hadn't foreseen in practical and cost-effective ways, like a full fuse board and repositioning the water stopcock. They kept in touch with us throughout the job, and were happy to come back to sort out final touches at a later date. Communication was great overall, they were friendly and professional, and always tidied up well at the end of each day. We've since had them back on other projects, and they've continued to do an excellent job.
    Verified reviewer
    Job location: LS13
  • 10

    Kitchen refurb.

    Posted 03 November 2025

    Ben was prompt with calling giving a very competitive quote. He also provided a full list of materials required including measurements making purchasing of worktops etc much easier. Although being busy, he was able to fit us in within our timeframe. Ben, Michael and 2 apprentices started the work approximately 3 weeks after first visiting. The work was completed to a very high standard and everything tidy on completion. We can’t praise these guys enough. We’d like to say more but limited on the review. Thank you again for the work. Highly recommended
    Verified reviewer
    Job location: BD6
  • 9.67

    Kitchen cupboard doors adjustment made.

    Posted 03 May 2025

    The trade man did a very good service, he was quick, friendly and efficient. I would definitely recommend using him again.
    Verified reviewer
    Job location: BD12
  • 10

    Kitchen fitting

    Posted 03 May 2025

    Ben and Michael recently fitted my kitchen, and I couldn’t be happier. From the initial visit, Ben gave me confidence in the quality of their work—and they delivered. After being let down by a previous tradesman, their professionalism and attention to detail were a breath of fresh air. They kept me updated throughout and even fixed issues from the last job, some at no extra cost. There’s a small job left, but the finish is impeccable. I’ll definitely use them again and recommend them to others. Huge thanks to you both—you’ve been brilliant!
    Verified reviewer
    Job location: WF17