Reviews

  • 10

    Take down chimney stack

    Posted 07 October 2020

    Turned up at 8 a.M. And got straight on putting up the working tower. They kept all the brick work from coming back down the inside. Cut of the internal old gas pipe flu pipe and made good. Re tiled using some tiles that I had. Cleared away and took down the working tower.
    Job location: PO36
  • 10

    Relaid paving stones over a large area.

    Posted 11 July 2020

    A difficult job done very well.
    Verified reviewer
    Job location: PO37
  • 8.5

    Re rendering of garden seating (built in) and correct defects

    Posted 10 July 2020

    A good job overall, tidy workmen Polite and efficient
    Verified reviewer
    Job location: PO37