Work photos

This property required a new connection for a new shower room being installed at the side of the property. This involved lifting the crazy paving to excavate and install the new 110mm uPVC. We re-instated the surfaces as found. We used reclaimed Vitrified Clay in the Inspection Chamber to match the existing connections, with a rocker joint preceding the IC
Trade profile image

Pukka Drains

(239 reviews)