Work photos

The Inspection Chamber (IC) kept blocking at this property, due to an SVP being installed on an old gully connection, which was too high in the IC. We installed a new connection at the correct invert level and modified the benching to prevent future blockages
Trade profile image

Pukka Drains

(239 reviews)