Work photos

A CCTV Survey confirmed the old VC lines were close to collapse. The gully had failed, as well as the benching. Excavation to remove the failed pipework, and replaced with new uPVC. Re-instated patio, job done.
Trade profile image

Pukka Drains

(239 reviews)