Work photos

Excavation to remove and replace 29 metres of failed 6" Pitch Fibre pipe. This pipe had blistered and deformed so badly, that the HPW Jetting 1/2" nozzle was barely able to fit through in places.. A previous company had lined the pipe in this failed condition. A part of this liner is visible in the pictures. The ONLY option was to excavate and replace with new 160mm uPVC. Re-instated a dropped junction, as well as rectifying a 4 metre long belly in the pipe too.. We had to replace 20m of sunken pathways, that we discovered a void underneath the majority. Four weeks later and all done; all surfaces re-instated.