Boilers

90% finished. Some small tweaks to do before finishing. Fire valve had to be moved a metre away by a metre. Note the fuel deaerator (tigerloop), ABOVE burner height. Important to prevent nuisance lockouts or premature pump wear.
Trade profile image

Shape Contractor Ltd

(560 reviews)