Boilers

This boiler was installed to replace a failed unit. It was installed with a scale inhibiting device, an adey magnaclean magnetic filter, and most importantly extra expansion to match the heating calculations. A full chemical machine powerflush was carried out prior to installation.
Trade profile image

Shape Contractor Ltd

(560 reviews)