Homeowner
Trades
Posted 29 November 2022
Posted 05 January 2022
Response from Thatcher Builders Ltd
I just wished you gave a honest opinion because everything was done to a great standard and the leak was a poor coupling on existing pipe work which we done. There is a access panel as you asked us to tile the bath panel which was a extra job which we did not want to do really so we done that and then made the access panel in the cupboard in the hallway where the shower and bath taps are Please make the final payment of £500.00 pounds which is owed We came everyday from 8 to 4 and the day I left you said you were happy with the works Ray Thatcher
Posted 05 November 2021
Posted 15 October 2021
Posted 24 September 2021
Posted 15 August 2021