Our customer contacted us after noticing an issure with his solar generation. We were able to diagnose the issue over the phone and suggested this would need further investigation, but probably an issue with the inverter. We installed a new GoodWe inverter which comes with free monitoring and 10 years warranty.
We used the some of the latest solar panel technology on this installation with 320W half cell modules in an all black finish. These were mounted on our TRIC mounting and fed into a GoodWe 3.6DNS with wi-fi monitoring. To ensure maximum self-consumption we also installed a Solar iBoost immersion controller. To prevent against pest damage we also installed pest exclusion around the modules (not pictured).
For this 3.7kW install we used JA Solar 310W all black modules on our TRIC mounting system. The power generated is fed into a GoodWe 3.6kW inverter with wi-fi monitoring.
We installed a 4kW solar PV system using 310W JA modules. We also added pest protection to this array to ensure that no rodents or birds nest under the solar array. To compliment this array the customer opted for 7.2kW of battery storage using a hybrid inverter.
We installed a 4kW solar PV system using 310W JA modules. We also added pest protection to this array to ensure that no rodents or birds nest under the solar array. To compliment this array the customer opted for 7.2kW of battery storage using a hybrid inverter.
We installed a 4kW solar PV system using 310W JA modules. We also added pest protection to this array to ensure that no rodents or birds nest under the solar array. To compliment this array the customer opted for 7.2kW of battery storage using a hybrid inverter.
We were employed to install 216kW of solar PV modules across 4 separate roofs on a farm estate in West Sussex. In addition we were also contracted to complete the electrical installation for each array.
This is an in-roof installation for a local property. Consisting of 3.25kW of Solar PV with an additional 6.8kWh of battery storage capability. This installation was installed on the garage adjacent to the main property.
20kW Solar PV installation near Chichester. https://www.wagner-renewables.com/case-study/chichester-20kw/
20kW Solar PV installation near Chichester. https://www.wagner-renewables.com/case-study/chichester-20kw/
20kW Solar PV installation near Chichester. https://www.wagner-renewables.com/case-study/chichester-20kw/
20kW Solar PV installation near Chichester. https://www.wagner-renewables.com/case-study/chichester-20kw/
20kW Solar PV installation near Chichester. https://www.wagner-renewables.com/case-study/chichester-20kw/
Optimised Solar PV and battery storage installation in Worthing West Sussex https://www.wagner-renewables.com/case-study/worthing-4-7kw/
Optimised Solar PV and battery storage installation in Worthing West Sussex https://www.wagner-renewables.com/case-study/worthing-4-7kw/
Optimised Solar PV and battery storage installation in Worthing West Sussex https://www.wagner-renewables.com/case-study/worthing-4-7kw/
4.2kW Solar PV using all black JA modules, optimised with Tigo and added immersion control to heat water from excess solar generation.
3.6kW install using Peimar 300W all black modules, SolaX inverter and ERS immersion control.
3.6kW install using Peimar 300W all black modules, SolaX inverter and ERS immersion control.
3.6kW install using Peimar 300W all black modules, SolaX inverter and ERS immersion control.
3.6kW install using Peimar 300W all black modules, SolaX inverter and ERS immersion control.
3.6kW install using Peimar 300W all black modules, SolaX inverter and ERS immersion control.
3.6kW install using Peimar 300W all black modules, SolaX inverter and ERS immersion control.
3.6kW install using Peimar 300W all black modules, SolaX inverter and ERS immersion control.
3.6kW install using Peimar 300W all black modules, SolaX inverter and ERS immersion control.
50kW commercial installation on a sports hall using JA Solar 295W modules and a Solis inverter.
50kW commercial installation on a sports hall using JA Solar 295W modules and a Solis inverter.
50kW commercial installation on a sports hall using JA Solar 295W modules and a Solis inverter.
50kW commercial installation on a sports hall using JA Solar 295W modules and a Solis inverter.
50kW commercial installation on a sports hall using JA Solar 295W modules and a Solis inverter.
50kW commercial installation on a sports hall using JA Solar 295W modules and a Solis inverter.
50kW commercial installation on a sports hall using JA Solar 295W modules and a Solis inverter.
50kW commercial installation on a sports hall using JA Solar 295W modules and a Solis inverter.
50kW commercial installation on a sports hall using JA Solar 295W modules and a Solis inverter.
Removal and replacement of solar array to allow for a re-roof. Completed using the existing mounting and solar equipment.
Removal and replacement of solar array to allow for a re-roof. Completed using the existing mounting and solar equipment.
Removal and replacement of solar array to allow for a re-roof. Completed using the existing mounting and solar equipment.
Removal and replacement of solar array to allow for a re-roof. Completed using the existing mounting and solar equipment.
Removal and replacement of solar array to allow for a re-roof. Completed using the existing mounting and solar equipment.
Solar panel and battery storage install using all black modules, GoodWe Hybrid inverter, as well as the infrastructure for EV charging added.
Solar panel and battery storage install using all black modules, GoodWe Hybrid inverter, as well as the infrastructure for EV charging added.
Solar panel and battery storage install using all black modules, GoodWe Hybrid inverter, as well as the infrastructure for EV charging added.
Solar panel and battery storage install using all black modules, GoodWe Hybrid inverter, as well as the infrastructure for EV charging added.
Solar panel and battery storage install using all black modules, GoodWe Hybrid inverter, as well as the infrastructure for EV charging added.
Solar panel and battery storage install using all black modules, GoodWe Hybrid inverter, as well as the infrastructure for EV charging added.
Zappi installation connected into the solar array.
Zappi installation connected into the solar array.
6kWp install using full black modules, GoodWe hybrid, pylon batteries, and a Zappi EV Charger.
6kWp install using full black modules, GoodWe hybrid, pylon batteries, and a Zappi EV Charger.
6kWp install using full black modules, GoodWe hybrid, pylon batteries, and a Zappi EV Charger.
6kWp install using full black modules, GoodWe hybrid, pylon batteries, and a Zappi EV Charger.
6kWp install using full black modules, GoodWe hybrid, pylon batteries, and a Zappi EV Charger.
6kWp install using full black modules, GoodWe hybrid, pylon batteries, and a Zappi EV Charger.
2.4kW Solar installation with Tigo optimisation & Solis inverter.
2.4kW Solar installation with Tigo optimisation & Solis inverter.
2.4kW Solar installation with Tigo optimisation & Solis inverter.
2.4kW Solar installation with Tigo optimisation & Solis inverter.
2.4kW Solar installation with Tigo optimisation & Solis inverter.
Full clean of the solar array, and addition of pest exclusion kit to stop birds / pests getting under the array.
Full clean of the solar array, and addition of pest exclusion kit to stop birds / pests getting under the array.
Full clean of the solar array, and addition of pest exclusion kit to stop birds / pests getting under the array.
Full clean of the solar array, and addition of pest exclusion kit to stop birds / pests getting under the array.
Full clean of the solar array, and addition of pest exclusion kit to stop birds / pests getting under the array.
Install of a new EV charger. The model used here is a Zappi, this works in conjuntion with Solar to charge your car!
Install of a new EV charger. The model used here is a Zappi, this works in conjuntion with Solar to charge your car!
Solar panel clean and full service of system - incorrect installation methods corrected, and safety check completed.
Solar panel clean and full service of system - incorrect installation methods corrected, and safety check completed.
Solar panel clean and full service of system - incorrect installation methods corrected, and safety check completed.
Solar panel clean and full service of system - incorrect installation methods corrected, and safety check completed.
4.2kW Solar installation using Peimar 300W Full black modules with GoodWe Hybrid inverter for battery storage and UPS power back up.
4.2kW Solar installation using Peimar 300W Full black modules with GoodWe Hybrid inverter & Pylontech batteries for battery storage and UPS power back up.
4.2kW Solar installation using Peimar 300W Full black modules with GoodWe Hybrid inverter & Pylontech batteries for battery storage and UPS power back up.
2kW Solar installation using JA Solar 295W black modules and GoodWe inverter.
2kW Solar installation using JA Solar 295W black modules and GoodWe inverter.
2kW Solar installation using JA Solar 295W black modules and GoodWe inverter.
2kW Solar installation using JA Solar 295W black modules and GoodWe inverter.
4kW Solar panel installation using JA295 Black modules combined with SolaX battery storage, and immersion control using E.R.S. Mini from PowerFlow
4kW Solar panel installation using JA295 Black modules combined with SolaX battery storage, and immersion control using E.R.S. Mini from PowerFlow
New installation of 10 solar panels of the garage as part of a home rebuild. East west installation to maximise generation feeding into a Solis Dual inverter.
New installation of 10 solar panels of the garage as part of a home rebuild. East west installation to maximise generation feeding into a Solis Dual inverter.
New installation of 10 solar panels of the garage as part of a home rebuild. East west installation to maximise generation feeding into a Solis Dual inverter.
New installation of 10 solar panels of the garage as part of a home rebuild. East west installation to maximise generation feeding into a Solis Dual inverter.
New installation of 10 solar panels of the garage as part of a home rebuild. East west installation to maximise generation feeding into a Solis Dual inverter.
New installation of 10 solar panels of the garage as part of a home rebuild. East west installation to maximise generation feeding into a Solis Dual inverter.
8kW solar PV installation in Sidlesham at Wagner HQ. Using TRIC A Frames and JA 285w modules.
Samil Solar Lake inverter, with Tigo individual panel optimisation and monitoring.
2kW PowerFlow battery storage to go with our 8kW solar PV system.
Solar PV installation using Bisol Panels. 4.2kW total capactity with immersion integration.
22kW Install for Reynolds in Bognor using Sun Edison 280W modules.
50kW solar PV install on Reynolds Furniture Warehouse in Bognor. Installed using TRIC mounting and JA Solar 285W modules.
3.7kW Solar PV installation using LG 285W modules, and a Goodwe inverter with built in Wi-Fi monitoring.
A 2kW solar PV install on a flat roof using TRIC F Box mounting, a Goodwe Inverter, and ET 250W solar modules.
A 2kW solar PV install on a flat roof using TRIC F Box mounting, a Goodwe Inverter, and ET 250W solar modules.
A 2kW solar PV install on a flat roof using TRIC F Box mounting, a Goodwe Inverter, and ET 250W solar modules.
4kW solar PV install using JA Solar 250W modules, Tigo panel optimisation, Goodwe inverter with wi-fi monitoring and Solar iBoost hot water immersion control.
Tigo cloud connect with 'PV Safe' mode.
Goodwe inverter with wi-fi monitoring.
Solar iBoost for diverting any surpluss energy to heat water in immersion tanks.
4kW solar PV install using JA Solar 250W modules, Tigo panel optimisation, Goodwe inverter with wi-fi monitoring and Solar iBoost hot water immersion control.
4kW Solar PV install using Solarworl modules and Goodwe inverter.
2kW PowerFlow battery storage add-on to compliment an existing Ssolar PV system.
Removal and disposal of the existing mounting system. Panels were cleaned and treated with Nano-Shell and then panels re-installed using our TRIC mounting.
Full clean of a ground mounted solar PV system in Sidlesham.
Full clean of a ground mounted solar PV system in Sidlesham.
Full clean of a ground mounted solar PV system in Sidlesham.
Solar PV installed on in several different parts of the roof, optimised with Solar Edge on BISOL panels, and battery storage added using PowerFlow Sundial
Solar PV installed on in several different parts of the roof, optimised with Solar Edge on BISOL panels, and battery storage added using PowerFlow Sundial
Solar PV installed on in several different parts of the roof, optimised with Solar Edge on BISOL panels, and battery storage added using PowerFlow Sundial
Solar PV installed on in several different parts of the roof, optimised with Solar Edge on BISOL panels, and battery storage added using PowerFlow Sundial
Solar PV installed on in several different parts of the roof, optimised with Solar Edge on BISOL panels, and battery storage added using PowerFlow Sundial
Solar PV installed on in several different parts of the roof, optimised with Solar Edge on BISOL panels, and battery storage added using PowerFlow Sundial
Solar PV installed on in several different parts of the roof, optimised with Solar Edge on BISOL panels, and battery storage added using PowerFlow Sundial
Solar PV installed on in several different parts of the roof, optimised with Solar Edge on BISOL panels, and battery storage added using PowerFlow Sundial
The solar PV was removed to allow for roofing works, due to incorrect installation by another company a new mounting system was quoted for and provided. The panels were cleaned and treated with nanoshell before the system was reinstalled, and a service given to ensure everything was working.
The solar PV was removed to allow for roofing works, due to incorrect installation by another company a new mounting system was quoted for and provided. The panels were cleaned and treated with nanoshell before the system was reinstalled, and a service given to ensure everything was working.
The solar PV was removed to allow for roofing works, due to incorrect installation by another company a new mounting system was quoted for and provided. The panels were cleaned and treated with nanoshell before the system was reinstalled, and a service given to ensure everything was working.