removal of Worcester 30CDI. here the control box was damaged leaving live 240v exposed, potentially very dangerous. boiler revoved and new one installed
here the flue sample point was missing and had been taped over!! This appliance was removed and a new worcester 32cdi installed
Boiler Installation following removal of defective worcester 30cdi
Boiler commissioned ready for use, customer taken through controls procedure at handover
flue brickwork sealed, pressure relief valve pipework and condensate done. all areas swept including stone cills and gutter cleared
Magnaclense in use, flue gas analysis done at the same time to ensure combustion is as per the manufacturers instructions
New worcester 4000 mounted on the wall, flue done, wired up and tested. magnaclense connected ready to be used.
New condensate pipework, insulated through the cavity, uprated to 32mm and clipped to the wall as per manufacturers instructions, done this way prevents freezing during the winter months
old worcester junior 28i removed
Removal of unclipped inadequate sized condensate pipework
Removal of old inadequate condensate pipework
Removal of old worcester 28i Junior that had been in for over 15 years
Customer wanted this boiler replacing, it was located in a cupboard behind a W/C. Atight space to work in but got the job done.
Old Biasi Riva off the wall and brickwork core drilled ready for the condensate pipework
New boiler installed and magnaclense system in use
New Flue installed complete with terminal guard due to being less than 2m off the ground
Boiler complete ready for the magnetic cupboard to be refitted
removed ideal icos and replaced with a worcester 27RI condensing system boiler inc gas pipe upgrade. tight space but got the job done
system boiler to condensing combi including gas supply upgrade. old one out, new one in and kitchen unit refitted
system boiler to condensing combi including gas supply upgrade.
system boiler to condensing combi including gas supply upgrade.
condensing pump installation
combi to condensing combi with a horizontal flue kit
Flue termination and pressure relief valve, once completed all upvc plastics cleaned off
floor standing system boiler to wall hung condensing system boiler
Preview of New Worcester boiler installation.
system boiler to condensing combi including gas supply upgrade. removed old floor standing boiler from beneath kitchen units and relocated boiler within the kitchen, in preparation for a new kitchen installation
system boiler to condensing combi including gas supply upgrade. removed old floor standing boiler from beneath kitchen units and relocated boiler within the kitchen, in preparation for a new kitchen installation
Flue termination and pressure relief valve, once completed all upvc plastics cleaned off
combi to condensing combi with a horizontal flue kit
combi to condensing combi with a horizontal flue kit
vertical flue to avoid an RSJ before going horizontal through access void
horizontal flue kit through a void with an access hatch
combi to condensing combi with a vertical to horizontal flue kit
combi to condensing combi with a horizontal flue kit
combi to condensing combi with a horizontal flue kit
Full central heating system. The flat was bought to rent out and had no central heating system.
A rental property that had its boiler stolen. replaced with a heatline capriz 2, ready for the next tenant, once other trades had finished their work
combi to condensing combi with a horizontal flue kit
Full central heating system. The house was bought to sell and had no central heating.
Full central heating system. The house was bought to sell and had no central heating.
system boiler to condensing combi including gas supply upgrade, in preparation for a new kitchen installation
testing of the gas pipework prior and post boiler installation
flue exit, pressure relief valve and condensate pipework
magnaclense in use and combustion analysis to confirm correct operation
system boiler to condensing combi including gas supply upgrade. removed old floor standing boiler from beneath kitchen units and relocated boiler within the kitchen, in preparation for a new kitchen installation
system boiler to condensing combi including gas supply upgrade. removed old floor standing boiler from beneath kitchen units and relocated boiler within the kitchen, in preparation for a new kitchen installation
carrying out earth loop impedance test following wiring up of the new boiler
combi to condensing combi with a horizontal flue kit
combi to condensing combi with a horizontal flue kit
upgraded gas supply to the new boiler
system boiler to condensing combi including gas supply upgrade
combi to condensing combi with a vertical flue kit
combi to condensing combi with a horizontal flue kit
combi to condensing combi with a horizontal flue kit
existing pipework and radiators getting the magnaclense treatment
Flue termination and pressure relief valve, once completed all upvc plastics cleaned off
Removed existing combi boiler from the kitchen and replaced with a new condensing combi relocated to a bedroom