Reviews

  • 10

    Scaffolding required for British Gas Installation of Boiler Flue.

    Posted 26 June 2019

    Scaffolding was required for British Gas to swap out Flue for new boiler above sloping garage roof. Gary arrived on a Sunday to view the job and provided a quote, (a third of another BG cost!!). We agreed a date and time for the scaffold to be erected and his team of 3-men arrived as agreed. The job took 45 mins to be fully erected and certified (A BG requirement). The BG installation took just one day and the team arrived that evening to recover the scaffolding. I was very impressed by both the price and the quality of the workmanship and would highly recommend Gary and his team.
    Verified reviewer
    Job location: RM12
  • 10

    Scaffold Tower with lifting beam to lift Plant onto Mezzanine Floor

    Posted 10 April 2019

    The job was surveyed and priced very reasonably and a time-frame was agreed. The tower and lifting beam was built on the day prior to our works. It was a complex job which required skill and care. On the day of the lift WM Scaffolding sent a team to assist our crew and put a platform in after each lift. The crew were very helpful, conscientious, hard working and punctual. After the lifting was complete the crew dismantled the scaffolding and left the site clean and tidy. I will not hesitate in using them again for all my scaffolding needs.
    Job location: Not Available
  • 9.5

    Scaffolding.

    Posted 10 April 2019

    Everything was fine and no troubles at all.
    Verified reviewer
    Job location: Not Available
  • 8.5

    Scaffolding.

    Posted 10 April 2019

    Very good and good value.
    Verified reviewer
    Job location: Not Available
  • 8.75

    Scaffolding.

    Posted 10 April 2019

    No comments given.
    Verified reviewer
    Job location: Not Available