Roof texture

Wayne P

Jobs booked
3
Reviews
1

Reviews (1)

  • MAG Developments SW LtdMAG Developments SW Ltd
    4

    Ground works including drains and concrete pathway

    Posted 05 August

    The job had issues with miss communication which may not have been all down to the contractor. However, the standard of work was very very poor. ACO drains were left unsealed at joins but worse still a corner section was made using two standard drains and it was left open directly against the external foundations of my property. A soil waste pipe was removed and replaced and none of the render was made good. General industry best practice guildines were not followed. Ground levels too high with air bricks left at ground level and render left below ground against concrete instillation.
    Verified reviewer
    Job location: PL3